Home?Import Representation? Double Cone Import Customs Clearance Case Study: How a 22-Year Veteran Agent Completed Shanghai Bay Clearance in 3 Days?
An Import Clearance Speed That Surprised Industry Peers
In February 2023, a batch of industrial double cone equipment arrived at Shanghai Pudong International Airport. Under normal procedures, such electromechanical productsImport Clearancerequire 15-20 working days. But surprisingly, from cargo arrival to completed customs clearance,ZhongShen International Trade的團隊僅用了3個完整工作日。這個案例在業(yè)內(nèi)引起不小震動,今天我們就來解密這個”不可能完成的任務(wù)”是如何實現(xiàn)的。
Three Key Challenges in Double Cone Imports
As specialized industrial equipment, double cone imports face three main difficulties:
Complex HS Classification: Double cone equipment may be classified under 8419 (drying equipment) or 8479 (other machinery), with a 5% tariff difference
Professional Declaration Requirements: Need to accurately declare 15 technical parameters including working pressure, capacity, and material
High Inspection Risk: Customs maintains over 30% inspection rate for electromechanical products
中申國貿(mào)的”預(yù)清關(guān)”創(chuàng)新模式
我們采用的”預(yù)清關(guān)四步法”是本次快速通關(guān)的核心:
7 Days Before Arrival: Complete consignee/shipper registration and exemption3Ccertification application
This case proves that professionalImport Representation不僅能規(guī)避風險,更能創(chuàng)造時間價值。當大多數(shù)同行還在為清關(guān)延誤焦頭爛額時,成熟的通關(guān)方案已經(jīng)可以讓貨物”飛”出海關(guān)監(jiān)管區(qū)。